{"id":838,"date":"2020-03-12T10:32:22","date_gmt":"2020-03-12T09:32:22","guid":{"rendered":"https:\/\/sustreat.eu\/energetic-recycling-of-sewage-sludge\/"},"modified":"2020-03-23T14:42:33","modified_gmt":"2020-03-23T13:42:33","slug":"energetic-recycling-of-sewage-sludge","status":"publish","type":"page","link":"https:\/\/sustreat.eu\/en\/baufortschritt\/energetic-recycling-of-sewage-sludge\/","title":{"rendered":"ENERGETIC RECYCLING OF SEWAGE SLUDGE"},"content":{"rendered":"<h1>\n\t\t\n\t<\/h1>\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-01.jpg\" alt=\"Delivery of the gasifier\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>06.12.2016 Delivery of the gasifier<\/strong><br>The heart of the plant, the gasifier, was delivered and erected as soon as the concrete of the base plate was able to bear the load.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-02.jpg\" alt=\"16.12.2016 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>16.12.2016 Progress of construction<\/strong>After the gasifier was installed, the steel skeleton of the hall construction was started.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-03.jpg\" alt=\"24.01.2017 Construction progress\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>24.01.2017 Construction progress<\/strong><br>Parallel to the erection of the steel hall structure, the extension for the synthesis gas cogeneration plant was constructed from precast concrete elements. The control centre is also located in the extension on the 1st floor.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-04.jpg\" alt=\"07.02.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>07.02.2017 Progress of construction<\/strong><br>Plant components were also added as construction progressed steadily. In the foreground, on the left-hand side, the compressed air tanks can be seen. To the right of it you can see the gas filter.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-05.jpg\" alt=\"15.02.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>15.02.2017 Progress of construction<\/strong><br>The steel skeleton construction of the hall structure is completed. You can see the finished cubature of the building. Clearly visible (red) is the thermal afterburning (TNV) on the 1st floor.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-25.jpg\" alt=\"Facade Cladding\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"236\" \/>\n\t\tAt the end of February 2017 the installation of the facade cladding could be started.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-07.jpg\" alt=\"16.03.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>16.03.2017 Progress of construction<\/strong><br>The picture shows the connection of the system components, such as the 2nd carburettor stage (left) and the gas scrubber (right).\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-26.jpg\" alt=\"View of the plant complex from the other side of the Rhine.\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"208\" \/>\n\t\tView of the plant complex from the other side of the Rhine.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-09.jpg\" alt=\"28.03.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>28.03.2017 Progress of construction<\/strong><br>The synthesis gas CHP has been delivered and still has to be moved to its fixed location. Afterwards the CHP unit will be integrated into the overall plant.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-10.jpg\" alt=\"31.03.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>31.03.2017 Progress of construction<\/strong><br>The chimney for the emergency TNV and the thermolysis burner is installed.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-11.jpg\" alt=\"04.04.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>04.04.2017 Progress of construction<\/strong><br>The picture shows in the upper part the two thermolysis screws as 1st gasifier stage.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-12.jpg\" alt=\"11.04.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>11.04.2017 Progress of construction<\/strong><br>The silos for dust and sewage sludge ash (front) are delivered and erected.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-13.jpg\" alt=\"27.06.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>27.06.2017 Progress of construction<\/strong><br>The roof area is also integrated into the plant structure. From left to right: lime silo, dry material silo, chimney for the emergency TNV and the thermolysis burner\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-14.jpg\" alt=\"04.09.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>04.09.2017 Progress of construction<\/strong><br>The power supply of the system and the control elements are laid and installed.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-15.jpg\" alt=\"02.11.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>02.11.2017 Progress of construction<\/strong><br>After the edges of the plant complex had been constructed, the area was sealed. On the one hand, it serves as a roadway for the delivery vehicles, and on the other hand, it is intended to protect the groundwater from the plant&#8217;s discharges.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-16.jpg\" alt=\"05.01.2018 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>05.01.2018 Progress of construction<\/strong><br>At the turn of the year the plant presents itself from the outside as finished. Inside, the cabling continues.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-17.jpg\" alt=\"2018 Completion\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>2018 Completion<\/strong>\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-18.jpg\" alt=\"Energetische Kl\u00e4rschlammverwertung Sustreat 18\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"411\" \/>\n\t\tOn 30.08.2016, the head of the building department, Martin Pr\u00fcmm, who retired at the end of the month, performed the symbolic ground-breaking ceremony in the presence of Bernhard Mohrs, plant manager of the Koblenz municipal wastewater treatment plant, and Thomas Ke\u00dfelheim, plant and project manager.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-19.jpg\" alt=\"The first excavations began in September.\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"234\" \/>\n\t\tThe first excavations began in September.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-20.jpg\" alt=\"After laying the basic pipes, the foundation work could begin.\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"234\" \/>\n\t\tAfter laying the basic pipes, the foundation work could begin.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-21.jpg\" alt=\"With suitable measures, even frosty days could not stop the progress.\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"234\" \/>\n\t\tWith suitable measures, even frosty days could not stop the progress.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-22.jpg\" alt=\"Energetische Kl\u00e4rschlammverwertung Sustreat 22\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"256\" \/>\n\t\tSince 1 September 2017, Bert Fl\u00f6ck has been the new head of the building department of the city of Koblenz. In the course of setting up the key components of the energy-related sewage sludge recycling plant, he and the managing director of KOPF SynGas GmbH &#038; Co.KG, Dr. Mey, are convinced of the progress of the submeasure.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-234.jpg\" alt=\"Energetische Kl\u00e4rschlammverwertung Sustreat 234\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"416\" \/>\n\t\tAt the beginning of January 2017, steel construction continued.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-24-380x600.jpg\" alt=\"Energetische Kl\u00e4rschlammverwertung Sustreat 24\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"380\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"600\" \/>\n\t\tAlso the carnival days did not stop the construction progress.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-06.jpg\" alt=\"23.02.2017 Progress of construction\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>23.02.2017 Progress of construction<\/strong><br>As construction progresses, the hall structure will be clad with a composite structure.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-08.jpg\" alt=\"Energetische Kl\u00e4rschlammverwertung Sustreat 08\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"431\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"322\" \/>\n\t\t<strong>28.02.2017 Progress of construction<\/strong><br>View of the building of the energetic sewage sludge utilisation from the other side of the Rhine, from the island Niederwerth. The silos for dust and ashes are missing.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-27.jpg\" alt=\"Energetische Kl\u00e4rschlammverwertung Sustreat 27\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"237\" \/>\n\t\tComponents of the new system technology are already installed.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-28.jpg\" alt=\"Energetische Kl\u00e4rschlammverwertung Sustreat 28\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"236\" \/>\n\t\tThe building with the plant technology is now completely clad.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-29.jpg\" alt=\"The process diagram.\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"420\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"236\" \/>\n\t\tThe process diagram.\n\t\t<img decoding=\"async\" src=\"https:\/\/sustreat.eu\/wp-content\/uploads\/2020\/03\/energetische-klaerschlammverwertung-sustreat-30-338x600.jpg\" alt=\"The process diagram.\" data-no-lazy=\"1\" itemprop=\"thumbnail\" \/>\n\t\t\t<!-- Overlay Wrapper -->\n\t\t\t <!-- Overlay Wrapper Closed -->\n\t\t\t\t\t\t\t<meta itemprop=\"width\" content=\"338\" \/>\n\t\t\t<meta itemprop=\"height\" content=\"600\" \/>\n\t\tThe process diagram.\n\t","protected":false},"excerpt":{"rendered":"<p>06.12.2016 Delivery of the gasifierThe heart of the plant, the gasifier, was delivered and erected as soon as the concrete of the base plate was able to bear the load. 16.12.2016 Progress of constructionAfter the gasifier was installed, the steel skeleton of the hall construction was started. 24.01.2017 Construction progressParallel to the erection of the &#8230; <a title=\"ENERGETIC RECYCLING OF SEWAGE SLUDGE\" class=\"read-more\" href=\"https:\/\/sustreat.eu\/en\/baufortschritt\/energetic-recycling-of-sewage-sludge\/\" aria-label=\"Read more about ENERGETIC RECYCLING OF SEWAGE SLUDGE\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":971,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"class_list":["post-838","page","type-page","status-publish"],"acf":[],"_links":{"self":[{"href":"https:\/\/sustreat.eu\/en\/wp-json\/wp\/v2\/pages\/838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sustreat.eu\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sustreat.eu\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sustreat.eu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sustreat.eu\/en\/wp-json\/wp\/v2\/comments?post=838"}],"version-history":[{"count":4,"href":"https:\/\/sustreat.eu\/en\/wp-json\/wp\/v2\/pages\/838\/revisions"}],"predecessor-version":[{"id":860,"href":"https:\/\/sustreat.eu\/en\/wp-json\/wp\/v2\/pages\/838\/revisions\/860"}],"up":[{"embeddable":true,"href":"https:\/\/sustreat.eu\/en\/wp-json\/wp\/v2\/pages\/971"}],"wp:attachment":[{"href":"https:\/\/sustreat.eu\/en\/wp-json\/wp\/v2\/media?parent=838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}